Call us on telephone icon 01226 785 722

Results

We Have become Official Distributors of The Thaler Equipment

Great news TSUK are now the official distributors of the Thaler equipment for the UK and Ireland. For new great deals on new equipment please contact 01226 785 722 or visit our website http://www.trenchlesssales.co.uk/…/thaler-cable-capstan-wi…/ More Thaler equipment will soon be added to our website. Call us to find out more about the sort of equipment we can supply.

Read More

Installation of 23m crossing of DN150 Naylor Clay

Equipment loaded and delivered to site this morning. This mts Perforator guided thrust boring equipment will be used to install a 23m crossing of DN150 naylor clay drainage pipe.

Read More

Trenchless Pipe Bursting Method

Trenchless Solutions operate static rod, cable pipe bursting and towing systems with pull back pressures up to 225t. These compact pipe bursting systems are easy to handle and can be operated from existing manholes or small temporary pits.

Read More

Venturi Water Pump Animation reached 160k views!

A rugged, simple and lightweight air operated pump that requires no priming and is capable of moving approximately 15,000 litres of water per hour, with a cost that is low enough to enable all crews to have one as standard equipment, thereby reducing waiting time and the high cost of hiring conventional equipment.

Read More

Training & Support

We are able to offer our clients the option of both operated plant hire and the facility to hire our operators to operate your own thrust boring equipment on site.

Read More

New Used Trenchless Equipment

Trenchless Sales UK offers an extensive range of used trenchless equipment. We pride ourselves in our high level of customer care and reliability of our pre-owned machines.

Read More

Full Hire and Service Packages Available

Full hire and service packages available including rig operators https://www.youtube.com/watch?v=3jiCb99IrFk based in Barnsley serving the UK and Ireland.

Read More

Installing 63m of DN300 Naylor Clay Jacking Pipe

Take a look at our short video of a recently completed guided auger boring project. https://www.youtube.com/watch?v=SQomrjUPFvs

Read More

2x Essig IP110mm Moles Sold

2 No. Essig IP110mm Moles before being delivered to a customer last week.

Read More

Equipment Loaded and Delivered to Site

Equipment loaded and delivered to site this morning. This mts Perforator guided thrust boring equipment will be used to install a 26m crossing of DN150 & a 30m crossing of DN225 naylor clay drainage pipe.

Read More

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT