Call us on telephone icon 01226 785 722

Results

Continued Investment in the Van Fleet

Continued investment in the van fleet with a new addition last week, and another great job by GC Signs.

Read More

Five Guided Auger Boring Projects Completed Recently

Five seperate Guided Auger Boring projects installing various sizes of Naylor Clay Drainage pipe have being completed this week, from the South coast up through the midlands, well done all the team great work!

Read More

TRIC’s lightweight Cable Pipe Bursters

TRIC’s lightweight compact design means that the equipment can be used where conventional pipe bursters just cannot fit.

Read More

System Loaded and Delivered to Site

Another system loaded and delivered to site this morning. The mts Perforator PBA 85 and associated tooling will be used to install 25mtr of DN225 Naylor clay jacking pipe. Take a look on our website to find out about all the services we can offer.

Read More

Mini HDD for underground installations

Trenchless Solutions offer this steered technique of mini horizontal directional drilling (Mini HDD) for underground pipelines installations...

Read More

Thaler Cable Capstan Winches, Drum Trailers and More

This Thaler Cable Capstan Winch range impresses due to its compact construction in combination with a high pulling force. With winches available between 1 to 20 ton of pulling force and 500 to 2000m of rope length depending on model.

Read More

Another Essig Smart Mole Sold and Delivered

Another Essig Smart mole sold and delivered this morning. The Essig ‘Smart’ IP range are the only moles on the market which inform the operator when servicing is required. Typical service intervals are between 6 to 8 months.

Read More

Hydraulic Cable Reeler Dispatched to Israel

New Hydraulic cable Reeler manufactured in our Barnsley depot before being wrapped and dispatched. This will accompany the Tric Tools Cable Bursting Equipment in Israel.

Read More

Equipment Delivered to Site to Install DN450

Our mts Perforator PBA150 guided auger boring system has been loaded and delivered to site to install 60mtr of DN450 Naylor Clay Jacking Pipe and complete the project.

Read More

Equipment Loaded and Delivered to Site this Morning

Equipment loaded and delivered to site this morning. The mts Perforator PBA85 system and DN150 tooling has been hired complete with operator to install Naylor Denlok DN150 Clay Jacking Pipe. For more details on equipment available visit www.trenchlessplanthire.co.uk

Read More

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT