Call us on telephone icon 01226 785 722

Results

How Guided Auger Boring Works

Want to see how Guided Auger Boring works, take a look at our detailed animation. For more information on the trenchless services we offer visit our website http://www.trenchlesssolutions.co.uk/our-services/ or call us at 01226 785 722.

Read More

Essig IP 55mm Moling Kits Delivered

Essig IP55mm moling kit delivered last week that included the Essig IP55mm Smart Mole, Safety Launcher, Lubricator, Optical Sight, Air Hose and Ranging Rod.

Read More

Light, Compact & Powerful Cable Pipe Burster

The TRIC formula puts big power in a small footprint, and the M100 is the most formidable example of that formula. Projects with tough ground conditions or limited access are natural candidates for the M100.

Read More

Servicing & Repairs for All Impact Mole Manufacturers

Based in Barnsley, Trenchless Sales UK is your specialist in servicing & repairs for all Impact Mole manufacturers. Our team of skilled, experienced and fully trained technicians are able to help you with all your mole servicing and repair needs.

Read More

Benefits of Operated Plant Hire

Benefits of Operated Plant Hire: -Trenchless Plant Hire can supply you with a wide range of thrust boring equipment with fully trained, competent and experienced Operatives.

Read More

15 Essig IP45mm Moling Kits Sold and Delivered

15 Essig IP45mm moling kits sold and delivered recently that included the Essig IP45mm Smart Mole, Safety Launchers, Lubricators, Optical Sights, Air Hoses and Ranging Rods.

Read More

Recently Completed Guided Auger Boring Project DN700

Take a look at our project video of our recently completed Guided Auger Boring works. DN700 Clay Drainage Pipe was installed to accurate line & grade. This was carried out using our mts Perforator Guided Auger Systems.

Read More

Light, Compact & Powerful Mini HDD System

EasyDrill Limited is the only company (world-wide) specialising in designing and building Directional Drills as attachments, via a quick hitch, for mini excavators.

Read More

Installing 36m of DN600 Concrete Pipe

Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.

Read More

Thaler Cable Capstan Winch Range

This Thaler Cable Capstan Winch range impresses due to its compact construction in combination with a high pulling force.

Read More

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT