2 x 40m waste water and surface water Drives of Naylor DN300 installed from 2.7m dia shafts on our Cambridge project working closely with our client the scheme was successfully completed on time and within budget.
TSL have the largest fleet of guided auger boring within the uk if you think we can help on your present or future projects give the team a call !!